Wind project capacity factor revenue sensitivity · Calculation guide

Use net capacity factors that already reflect availability and curtailment.

Calculation guide

Hold realized power price and rated MW constant for 8,760 hours.

change = mw*8760*(scenario-base)/100*price · sales = mw*8760*scenario/100*price

Inputs

Installed capacity (MW)

Example entry 10.0.

Baseline capacity factor (%)

Example entry 30.0 %. Allowed range 0 to 100.

Scenario capacity factor (%)

Example entry 35.0 %. Allowed range 0 to 100.

Realized price per MWh

Example entry 50.0 (in the selected currency).

Worked example

InputValue
Installed capacity (MW)10
Baseline capacity factor (%)30%
Scenario capacity factor (%)35%
Realized price per MWh50
ResultValue
Change in annual revenue219,000
Scenario annual revenue1,533,000

Calculation steps

Change in annual revenue = ((((Installed capacity (MW) × 8,760) × (Scenario capacity factor (%) − Baseline capacity factor (%))) ÷ 100) × Realized price per MWh)

((((10 × 8,760) × (35 − 30)) ÷ 100) × 50) = 219,000

Scenario annual revenue = ((((Installed capacity (MW) × 8,760) × Scenario capacity factor (%)) ÷ 100) × Realized price per MWh)

((((10 × 8,760) × 35) ÷ 100) × 50) = 1,533,000

Interpreting the result

The change isolates the revenue effect of the assumed capacity factor at an unchanged power price.

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Installed capacity (MW)1011Change in annual revenue219,000240,900
Baseline capacity factor (%)30%33%Change in annual revenue219,00087,600
Scenario capacity factor (%)35%39%Change in annual revenue219,000394,200
Realized price per MWh5055Change in annual revenue219,000240,900