Calculation guide
The second participation probability is conditional on reaching the first. Expected funding can be fractional at portfolio level.
Inputs
Initial portfolio companies
Example entry 20. Use whole numbers.
First-round participation probability
Example entry 60 %. Allowed range 0 to 100.
Second-round probability after first
Example entry 50 %. Allowed range 0 to 100.
First follow-on check
Example entry 100 (in the selected currency).
Second follow-on check
Example entry 200 (in the selected currency).
Available reserves
Example entry 2000 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| Initial portfolio companies | 20 |
| First-round participation probability | 60% |
| Second-round probability after first | 50% |
| First follow-on check | 100 |
| Second follow-on check | 200 |
| Available reserves | 2,000 |
| Result | Value |
|---|---|
| Expected reserve requirement | 2,400 |
| Expected reserve shortfall | 400 |
Calculation steps
Expected reserve requirement = (((Initial portfolio companies × First-round participation probability) ÷ 100) × (First follow-on check + ((Second-round probability after first ÷ 100) × Second follow-on check)))
(((20 × 60) ÷ 100) × (100 + ((50 ÷ 100) × 200))) = 2,400
Expected reserve shortfall = max(0, (Expected reserve requirement − Available reserves))
max(0, (2,400 − 2,000)) = 400
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Initial portfolio companies | 20 | 22 | Expected reserve requirement | 2,400 | 2,640 |
| First-round participation probability | 60% | 66% | Expected reserve requirement | 2,400 | 2,640 |
| Second-round probability after first | 50% | 55% | Expected reserve requirement | 2,400 | 2,520 |
| First follow-on check | 100 | 110 | Expected reserve requirement | 2,400 | 2,520 |
| Second follow-on check | 200 | 220 | Expected reserve requirement | 2,400 | 2,520 |
| Available reserves | 2,000 | 2,200 | Expected reserve shortfall | 400 | 200 |