Calculation guide
The entered payout is per thousand completed views. Apply the fill rate to requests, then apply completion to filled views. Use a completion-based payout only.
Inputs
Rewarded-ad requests
Example entry 100000. Use whole numbers.
Fill rate
Example entry 80 %. Allowed range 0 to 100.
Completion rate of filled ads
Example entry 75 %. Allowed range 0 to 100.
Net payout per 1,000 completed views
Example entry 12 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| Rewarded-ad requests | 100,000 |
| Fill rate | 80% |
| Completion rate of filled ads | 75% |
| Net payout per 1,000 completed views | 12 |
| Result | Value |
|---|---|
| Rewarded-ad proceeds | 720 |
| Expected filled views | 80,000 |
| Expected completed views | 60,000 |
Calculation steps
Rewarded-ad proceeds = ((((((Rewarded-ad requests × Fill rate) ÷ 100) × Completion rate of filled ads) ÷ 100) × Net payout per 1,000 completed views) ÷ 1,000)
((((((100,000 × 80) ÷ 100) × 75) ÷ 100) × 12) ÷ 1,000) = 720
Expected filled views = ((Rewarded-ad requests × Fill rate) ÷ 100)
((100,000 × 80) ÷ 100) = 80,000
Expected completed views = ((Expected filled views × Completion rate of filled ads) ÷ 100)
((80,000 × 75) ÷ 100) = 60,000
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Rewarded-ad requests | 100,000 | 110,000 | Rewarded-ad proceeds | 720 | 792 |
| Fill rate | 80% | 88% | Rewarded-ad proceeds | 720 | 792 |
| Completion rate of filled ads | 75% | 83% | Rewarded-ad proceeds | 720 | 796.8 |
| Net payout per 1,000 completed views | 12 | 13 | Rewarded-ad proceeds | 720 | 780 |