Calculation guide
Amounts are held constant over the period. Use one currency throughout.
Months = (renovation cost + rent lost during works) ÷ incremental monthly net rent
Inputs
Renovation cost
Example entry 15000 (in the selected currency).
Rent lost during works
Example entry 3000 (in the selected currency).
Additional monthly net rent
Example entry 250 (in the selected currency). Minimum 0.01.
Worked example
| Input | Value |
|---|---|
| Renovation cost | 15,000 |
| Rent lost during works | 3,000 |
| Additional monthly net rent | 250 |
| Result | Value |
|---|---|
| Payback period | 72 months |
| Annual incremental cash flow | 3,000 |
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Renovation cost | 15,000 | 16,500 | Payback period | 72 months | 78 months |
| Rent lost during works | 3,000 | 3,300 | Payback period | 72 months | 73.2 months |
| Additional monthly net rent | 250 | 275 | Payback period | 72 months | 65.454545 months |
