Calculation guide
Linear quote-settled contracts. Positive funding is paid by longs. Each row uses the applicable snapshot mark, signed quantity and interval rate. Excludes trading P&L.
Cash received = −signed base units × mark × interval funding rate.
Inputs
Signed contracts in base units (+ long)
Example entry 10. Allowed range -1000000000.0 to 1000000000.0.
Price per unit
Example entry 100 (in the selected currency). Minimum 1e-08.
Funding rate for this interval (%)
Example entry 0.1. Allowed range -100 to 100.
Worked example
Funding observations
| Signed contracts in base units (+ long) | Price per unit | Funding rate for this interval (%) |
|---|---|---|
| 10 | 100 | 0.1 |
| 10 | 110 | -0.05 |
| Result | Value |
|---|---|
| Net funding received | -0.45 |
| Total funding paid | 1 |
| Total funding received | 0.55 |
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Signed contracts in base units (+ long) (row 1) | 10 | 11 | Net funding received | -0.45 | -0.55 |
| Price per unit (row 1) | 100 | 110 | Net funding received | -0.45 | -0.55 |
| Funding rate for this interval (%) (row 1) | 0.1 | 1.1 | Net funding received | -0.45 | -10.45 |
