Mining revenue after difficulty and electricity · Calculation guide

Estimate expected daily proof-of-work revenue after the electricity bill.

Calculation guide

Bitcoin-style approximate work per block = difficulty × 2³² hashes. Constant difficulty and price; reward includes subsidy and fees. Power draw applies during uptime. Excludes equipment and other overhead.

net = hash/diff*86400/4294967296*reward*price*(1-pool/100)*up/100-24*kw*kwh*up/100 · coins = hash/diff*86400/4294967296*reward*(1-pool/100)*up/100 · power = 24*kw*kwh*up/100

Inputs

Equipment hash rate (TH/s)

Example entry 100.

Network difficulty (trillions)

Example entry 100.

Coins per block including fees

Example entry 3.2.

Cash price per coin

Example entry 80000 (in the selected currency).

Pool fee on rewards

Example entry 2 %. Allowed range 0 to 100.

Power while running (kW)

Example entry 3.

Electricity price per kWh

Example entry 0.10 (in the selected currency).

Active share of day

Example entry 90 %. Allowed range 0 to 100.

Worked example

InputValue
Equipment hash rate (TH/s)100
Network difficulty (trillions)100
Coins per block including fees3.2
Cash price per coin80,000
Pool fee on rewards2%
Power while running (kW)3
Electricity price per kWh0.1
Active share of day90%
ResultValue
Net daily operating result-1.93784
Expected daily coins after pool fee0.000057
Daily electricity cost6.48

Calculation steps

Net daily operating result = (((((((((Equipment hash rate (TH/s) ÷ Network difficulty (trillions)) × 86,400) ÷ 4,294,967,296) × Coins per block including fees) × Cash price per coin) × (1 − (Pool fee on rewards ÷ 100))) × Active share of day) ÷ 100) − ((((24 × Power while running (kW)) × Electricity price per kWh) × Active share of day) ÷ 100))

(((((((((100 ÷ 100) × 86,400) ÷ 4,294,967,296) × 3.2) × 80,000) × (1 − (2 ÷ 100))) × 90) ÷ 100) − ((((24 × 3) × 0.1) × 90) ÷ 100)) = -1.93784

Expected daily coins after pool fee = (((((((Equipment hash rate (TH/s) ÷ Network difficulty (trillions)) × 86,400) ÷ 4,294,967,296) × Coins per block including fees) × (1 − (Pool fee on rewards ÷ 100))) × Active share of day) ÷ 100)

(((((((100 ÷ 100) × 86,400) ÷ 4,294,967,296) × 3.2) × (1 − (2 ÷ 100))) × 90) ÷ 100) = 0.000057

Daily electricity cost = ((((24 × Power while running (kW)) × Electricity price per kWh) × Active share of day) ÷ 100)

((((24 × 3) × 0.1) × 90) ÷ 100) = 6.48

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Equipment hash rate (TH/s)100110Net daily operating result-1.93784-1.483624
Network difficulty (trillions)100110Net daily operating result-1.93784-2.350764
Coins per block including fees3.24.2Net daily operating result-1.93784-0.518415
Cash price per coin80,00088,000Net daily operating result-1.93784-1.483624
Pool fee on rewards2%3%Net daily operating result-1.93784-1.984189
Power while running (kW)34Net daily operating result-1.93784-4.09784
Electricity price per kWh0.11.1Net daily operating result-1.93784-66.73784
Active share of day90%99%Net daily operating result-1.93784-2.131624
Mining revenue after difficulty and electricity →