Calculation guide
Keep mining revenues, power prices and uptime constant. Initial outlay is new installed cost less immediate proceeds from selling old hardware. No discounting.
Outlay / additional daily cash flow, when payback is attainable.
Inputs
Installed replacement cost
Example entry 2000 (in the selected currency).
Old equipment sale proceeds
Example entry 500 (in the selected currency).
Old daily mining proceeds
Example entry 15 (in the selected currency).
New daily mining proceeds
Example entry 25 (in the selected currency).
Old daily operating cost
Example entry 9 (in the selected currency).
New daily operating cost
Example entry 7 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| Installed replacement cost | 2,000 |
| Old equipment sale proceeds | 500 |
| Old daily mining proceeds | 15 |
| New daily mining proceeds | 25 |
| Old daily operating cost | 9 |
| New daily operating cost | 7 |
| Result | Value |
|---|---|
| Simple payback in days | 125 |
| Daily cash-flow improvement | 12 |
| Incremental outlay | 1,500 |
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Installed replacement cost | 2,000 | 2,200 | Simple payback in days | 125 | 141.666667 |
| Old equipment sale proceeds | 500 | 550 | Simple payback in days | 125 | 120.833333 |
| Old daily mining proceeds | 15 | 17 | Simple payback in days | 125 | 150 |
| New daily mining proceeds | 25 | 28 | Simple payback in days | 125 | 100 |
| Old daily operating cost | 9 | 10 | Simple payback in days | 125 | 115.384615 |
| New daily operating cost | 7 | 8 | Simple payback in days | 125 | 136.363636 |