Open calculator ↗

Mineral royalty net smelter return · Calculation guide

Use payable metal quantity after recovery and payability adjustments.

Calculation guide

Subtract only off-site costs deductible under the royalty agreement. The royalty base floors at zero.

Royalty due = ((max(0, ((Payable metal units × Realized price per payable unit) − Permitted freight, treatment and refining costs)) × Royalty rate (%)) ÷ 100). Net smelter return before floor = ((Payable metal units × Realized price per payable unit) − Permitted freight, treatment and refining costs)

Inputs

Payable metal units

Example entry 100.

Realized price per payable unit

Example entry 1000 (in the selected currency).

Permitted freight, treatment and refining costs

Example entry 10000 (in the selected currency).

Royalty rate (%)

Example entry 2 %. Allowed range 0 to 100.

Worked example

InputValue
Payable metal units100
Realized price per payable unit1,000
Permitted freight, treatment and refining costs10,000
Royalty rate (%)2%
ResultValue
Royalty due1,800
Net smelter return before floor90,000

Calculation steps

Royalty due = ((max(0, ((Payable metal units × Realized price per payable unit) − Permitted freight, treatment and refining costs)) × Royalty rate (%)) ÷ 100)

((max(0, ((100 × 1,000) − 10,000)) × 2) ÷ 100) = 1,800

Net smelter return before floor = ((Payable metal units × Realized price per payable unit) − Permitted freight, treatment and refining costs)

((100 × 1,000) − 10,000) = 90,000

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Payable metal units100110Royalty due1,8002,000
Realized price per payable unit1,0001,100Royalty due1,8002,000
Permitted freight, treatment and refining costs10,00011,000Royalty due1,8001,780
Royalty rate (%)2%3%Royalty due1,8002,700
Mineral royalty net smelter return →