Calculation guide
Limit new drawdown to the unclaimed award amount.
draw = min(award-claimed,donations*match)
Inputs
Eligible new donations
Example entry 40000.0 (in the selected currency).
Grant per unit donated
Example entry 0.5.
Total matching award
Example entry 50000.0 (in the selected currency).
Previously drawn
Example entry 35000.0 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| Eligible new donations | 40,000 |
| Grant per unit donated | 0.5 |
| Total matching award | 50,000 |
| Previously drawn | 35,000 |
| Result | Value |
|---|---|
| Current grant draw | 15,000 |
Calculation steps
Current grant draw = min((Total matching award − Previously drawn), (Eligible new donations × Grant per unit donated))
min((50,000 − 35,000), (40,000 × 0.5)) = 15,000
Interpreting the result
Once cumulative drawdowns reach the award, further donations generate no additional grant payment.
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Eligible new donations | 40,000 | 20,000 | Current grant draw | 15,000 | 10,000 |
| Grant per unit donated | 0.5 | 0 | Current grant draw | 15,000 | 0 |
| Total matching award | 50,000 | 55,000 | Current grant draw | 15,000 | 20,000 |
| Previously drawn | 35,000 | 38,500 | Current grant draw | 15,000 | 11,500 |
