Marginal abatement cost per tonne · Calculation guide

Compare the project with its baseline over the same interval.

Calculation guide

Use consistent annualized costs and positive avoided emissions.

mac = (newCost-oldCost)/(oldEm-newEm)

Inputs

Annualized project cost

Example entry 120000.0 (in the selected currency).

Annualized baseline cost

Example entry 100000.0 (in the selected currency).

Baseline tonnes CO₂e

Example entry 1000.0.

Project tonnes CO₂e

Example entry 600.0.

Worked example

InputValue
Annualized project cost120,000
Annualized baseline cost100,000
Baseline tonnes CO₂e1,000
Project tonnes CO₂e600
ResultValue
Incremental cost per tonne avoided50

Calculation steps

Incremental cost per tonne avoided = ((Annualized project cost − Annualized baseline cost) ÷ (Baseline tonnes CO₂e − Project tonnes CO₂e))

((120,000 − 100,000) ÷ (1,000 − 600)) = 50

Interpreting the result

A negative cost per avoided tonne means the lower-emissions project also saves money against the baseline.

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Annualized project cost120,000132,000Incremental cost per tonne avoided5080
Annualized baseline cost100,000110,000Incremental cost per tonne avoided5025
Baseline tonnes CO₂e1,0001,100Incremental cost per tonne avoided5040
Project tonnes CO₂e600660Incremental cost per tonne avoided5058.823529
Marginal abatement cost per tonne →

Sources