Calculation guide
Use consistent annualized costs and positive avoided emissions.
mac = (newCost-oldCost)/(oldEm-newEm)
Inputs
Annualized project cost
Example entry 120000.0 (in the selected currency).
Annualized baseline cost
Example entry 100000.0 (in the selected currency).
Baseline tonnes CO₂e
Example entry 1000.0.
Project tonnes CO₂e
Example entry 600.0.
Worked example
| Input | Value |
|---|---|
| Annualized project cost | 120,000 |
| Annualized baseline cost | 100,000 |
| Baseline tonnes CO₂e | 1,000 |
| Project tonnes CO₂e | 600 |
| Result | Value |
|---|---|
| Incremental cost per tonne avoided | 50 |
Calculation steps
Incremental cost per tonne avoided = ((Annualized project cost − Annualized baseline cost) ÷ (Baseline tonnes CO₂e − Project tonnes CO₂e))
((120,000 − 100,000) ÷ (1,000 − 600)) = 50
Interpreting the result
A negative cost per avoided tonne means the lower-emissions project also saves money against the baseline.
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Annualized project cost | 120,000 | 132,000 | Incremental cost per tonne avoided | 50 | 80 |
| Annualized baseline cost | 100,000 | 110,000 | Incremental cost per tonne avoided | 50 | 25 |
| Baseline tonnes CO₂e | 1,000 | 1,100 | Incremental cost per tonne avoided | 50 | 40 |
| Project tonnes CO₂e | 600 | 660 | Incremental cost per tonne avoided | 50 | 58.823529 |
