Open calculator ↗

Levelized cost of storage · Calculation guide

Divide annualized capital, fixed operations and charging energy expense by annual electricity delivered.

Calculation guide

This all-in definition includes purchased charging power.

lcos = (pmt(capex,12*rate,life)+fixed)/output+price/(eff/100)

Inputs

Storage capital cost

Example entry 300000.0 (in the selected currency).

Annual fixed operating cost

Example entry 10000.0 (in the selected currency).

Useful life (years)

Example entry 10.0. Minimum 1. Use whole numbers.

Annual discount rate (%)

Example entry 0.0 %. Allowed range 0 to 100.

Annual delivered MWh

Example entry 1000.0. Minimum 1e-12.

Round-trip efficiency (%)

Example entry 80.0 %. Allowed range 1e-12 to 100.

Charging price per MWh

Example entry 40.0 (in the selected currency).

Worked example

InputValue
Storage capital cost300,000
Annual fixed operating cost10,000
Useful life (years)10
Annual discount rate (%)0%
Annual delivered MWh1,000
Round-trip efficiency (%)80%
Charging price per MWh40
ResultValue
All-in cost per MWh delivered90

Calculation steps

All-in cost per MWh delivered = (((payment(Storage capital cost, (12 × Annual discount rate (%)), Useful life (years)) + Annual fixed operating cost) ÷ Annual delivered MWh) + (Charging price per MWh ÷ (Round-trip efficiency (%) ÷ 100)))

(((payment(300,000, (12 × 0), 10) + 10,000) ÷ 1,000) + (40 ÷ (80 ÷ 100))) = 90

Interpreting the result

Lower efficiency increases the charging energy required for each delivered MWh.

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Storage capital cost300,000330,000All-in cost per MWh delivered9093
Annual fixed operating cost10,00011,000All-in cost per MWh delivered9091
Useful life (years)1011All-in cost per MWh delivered9087.272727
Annual discount rate (%)0%1%All-in cost per MWh delivered9091.674623
Annual delivered MWh1,0001,100All-in cost per MWh delivered9086.363636
Round-trip efficiency (%)80%88%All-in cost per MWh delivered9085.454545
Charging price per MWh4044All-in cost per MWh delivered9095
Levelized cost of storage →