Open calculator ↗

Key rate duration buckets · Calculation guide

Estimate each tenor’s interest-rate sensitivity from parallel-sized local shocks.

Calculation guide

Reprice the same full position with just one node bumped up or down by the specified basis points, using consistent interpolation. Sum of key rate durations approximates parallel duration for compatible bumps.

KRDᵢ = (Pdown − Pup) / (2P₀ × shock in decimal).

Inputs

Base portfolio value

Example entry 100000 (in the selected currency).

Symmetric shock per node (bp)

Example entry 10.

Key rate tenor (years)

Example entry 2. Allowed range 1e-06 to 200.

Price after downward shock

Example entry 100400 (in the selected currency).

Price after upward shock

Example entry 99600 (in the selected currency).

Worked example

InputValue
Base portfolio value100,000
Symmetric shock per node (bp)10

Curve-node repricings

Key rate tenor (years)Price after downward shockPrice after upward shock
2100,40099,600
10100,60099,400
ResultValue
Sum of key rate durations (years)10
Combined value change per 1 bp decline100

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Base portfolio value100,000110,000Sum of key rate durations (years)109.090909
Symmetric shock per node (bp)1011Sum of key rate durations (years)109.090909
Price after downward shock (row 1)100,400110,440Sum of key rate durations (years)1060.2
Price after upward shock (row 1)99,600109,560Sum of key rate durations (years)10-39.8
Key rate duration buckets →