Calculation guide
Long constant-notional scenario: exit the near contract and enter the next. Measure the return on the new contract if it subsequently reaches the near quote, net of stated round-trip trading costs. The quote gap is not an immediate cash gain.
Inputs
Near-contract exit quote
Example entry 100.
Next-contract entry quote
Example entry 102.
Round-trip costs (bp of new notional)
Example entry 5.
Worked example
| Input | Value |
|---|---|
| Near-contract exit quote | 100 |
| Next-contract entry quote | 102 |
| Round-trip costs (bp of new notional) | 5 |
| Result | Value |
|---|---|
| Net convergence return | -2.010784% |
| Gross convergence return | -1.960784% |
Calculation steps
Net convergence return = ((100 × ((Near-contract exit quote ÷ Next-contract entry quote) − 1)) − (Round-trip costs (bp of new notional) ÷ 100))
((100 × ((100 ÷ 102) − 1)) − (5 ÷ 100)) = -2.010784%
Gross convergence return = (100 × ((Near-contract exit quote ÷ Next-contract entry quote) − 1))
(100 × ((100 ÷ 102) − 1)) = -1.960784%
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Near-contract exit quote | 100 | 110 | Net convergence return | -2.010784% | 7.793137% |
| Next-contract entry quote | 102 | 112 | Net convergence return | -2.010784% | -10.764286% |
| Round-trip costs (bp of new notional) | 5 | 6 | Net convergence return | -2.010784% | -2.020784% |
