Calculation guide
Both tiers reference the same performance measure and period.
Inputs
Actual performance metric
Example entry 1400 (in the selected currency).
First threshold
Example entry 1000 (in the selected currency).
Second threshold
Example entry 1300 (in the selected currency).
First marginal payout rate
Example entry 20 %. Allowed range 0 to 100.
Second marginal payout rate
Example entry 30 %. Allowed range 0 to 100.
Maximum payout
Example entry 200 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| Actual performance metric | 1,400 |
| First threshold | 1,000 |
| Second threshold | 1,300 |
| First marginal payout rate | 20% |
| Second marginal payout rate | 30% |
| Maximum payout | 200 |
| Result | Value |
|---|---|
| Earn-out payment | 90 |
Calculation steps
Earn-out payment = min(Maximum payout, (((max(0, (min(Actual performance metric, Second threshold) − First threshold)) × First marginal payout rate) ÷ 100) + ((max(0, (Actual performance metric − Second threshold)) × Second marginal payout rate) ÷ 100)))
min(200, (((max(0, (min(1,400, 1,300) − 1,000)) × 20) ÷ 100) + ((max(0, (1,400 − 1,300)) × 30) ÷ 100))) = 90
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Actual performance metric | 1,400 | 1,540 | Earn-out payment | 90 | 132 |
| First threshold | 1,000 | 1,100 | Earn-out payment | 90 | 70 |
| Second threshold | 1,300 | 1,430 | Earn-out payment | 90 | 80 |
| First marginal payout rate | 20% | 22% | Earn-out payment | 90 | 96 |
| Second marginal payout rate | 30% | 33% | Earn-out payment | 90 | 93 |
| Maximum payout | 200 | 0 | Earn-out payment | 90 | 0 |
