Calculation guide
Use full position values on both sides, including position size. Report a positive DV01 for a position that gains when yields fall.
DV01 = (Pdown − Pup) / (2 × bump in bp).
Inputs
Position value after yield decline
Example entry 100200 (in the selected currency).
Position value after yield increase
Example entry 99800 (in the selected currency).
Yield shock each way (bp)
Example entry 5.
Worked example
| Input | Value |
|---|---|
| Position value after yield decline | 100,200 |
| Position value after yield increase | 99,800 |
| Yield shock each way (bp) | 5 |
| Result | Value |
|---|---|
| Value change per basis point decline | 40 |
| Difference between shocked position values | 400 |
Calculation steps
Value change per basis point decline = ((Position value after yield decline − Position value after yield increase) ÷ (2 × Yield shock each way (bp)))
((100,200 − 99,800) ÷ (2 × 5)) = 40
Difference between shocked position values = (Position value after yield decline − Position value after yield increase)
(100,200 − 99,800) = 400
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Position value after yield decline | 100,200 | 110,220 | Value change per basis point decline | 40 | 1,042 |
| Position value after yield increase | 99,800 | 109,780 | Value change per basis point decline | 40 | -958 |
| Yield shock each way (bp) | 5 | 6 | Value change per basis point decline | 40 | 33.333333 |
