Open calculator ↗

Development residual land value · Calculation guide

Calculate residual land value before land acquisition costs.

Calculation guide

The profit target is a percentage of gross development value. Include construction, professional, finance, marketing and other non-land costs. A negative residual indicates a shortfall.

residual = gdv*(1-profit/100)-build-other; target = gdv*profit/100

Inputs

Gross development value

Example entry 5000000 (in the selected currency).

Construction and site works

Example entry 2800000 (in the selected currency).

Other non-land costs

Example entry 550000 (in the selected currency).

Target profit on completed value

Example entry 18 %. Allowed range 0.0 to 100.0.

Worked example

InputValue
Gross development value5,000,000
Construction and site works2,800,000
Other non-land costs550,000
Target profit on completed value18%
ResultValue
Residual land value before land acquisition costs750,000
Target development profit900,000

Calculation steps

Residual land value before land acquisition costs = (((Gross development value × (1 − (Target profit on completed value ÷ 100))) − Construction and site works) − Other non-land costs)

(((5,000,000 × (1 − (18 ÷ 100))) − 2,800,000) − 550,000) = 750,000

Target development profit = ((Gross development value × Target profit on completed value) ÷ 100)

((5,000,000 × 18) ÷ 100) = 900,000

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Gross development value5,000,0005,500,000Residual land value before land acquisition costs750,0001,160,000
Construction and site works2,800,0003,080,000Residual land value before land acquisition costs750,000470,000
Other non-land costs550,000605,000Residual land value before land acquisition costs750,000695,000
Target profit on completed value18%20%Residual land value before land acquisition costs750,000650,000
Development residual land value →

Sources