Calculation guide
A required deposit above the contract price indicates extra funding is necessary.
Inputs
Contract value
Example entry 1000 (in the selected currency).
Pre-delivery cash outlays
Example entry 600 (in the selected currency).
Available internal cash
Example entry 100 (in the selected currency).
Agreed deposit
Example entry 30 %. Allowed range 0 to 100.
Worked example
| Input | Value |
|---|---|
| Contract value | 1,000 |
| Pre-delivery cash outlays | 600 |
| Available internal cash | 100 |
| Agreed deposit | 30% |
| Result | Value |
|---|---|
| Required deposit percentage | 50% |
| Funding gap after deposit | 200 |
Calculation steps
Required deposit percentage = ((100 × max(0, (Pre-delivery cash outlays − Available internal cash))) ÷ Contract value)
((100 × max(0, (600 − 100))) ÷ 1,000) = 50%
Funding gap after deposit = max(0, ((Pre-delivery cash outlays − Available internal cash) − ((Contract value × Agreed deposit) ÷ 100)))
max(0, ((600 − 100) − ((1,000 × 30) ÷ 100))) = 200
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Contract value | 1,000 | 1,100 | Required deposit percentage | 50% | 45.454545% |
| Pre-delivery cash outlays | 600 | 660 | Required deposit percentage | 50% | 56% |
| Available internal cash | 100 | 110 | Required deposit percentage | 50% | 49% |
| Agreed deposit | 30% | 33% | Funding gap after deposit | 200 | 170 |
