Calculation guide
Rebase the linked observation to 100 at the specified old-series base date. All indexes must share equivalent coverage.
Linked and rebased index = (((100 × Old index at overlap) × New series at target date) ÷ (New series at overlap × Old index at new base date))
Inputs
Old index at new base date
Example entry 100. Minimum 1e-06.
Old index at overlap
Example entry 120. Minimum 1e-06.
New series at overlap
Example entry 100. Minimum 1e-06.
New series at target date
Example entry 110. Minimum 1e-06.
Worked example
| Input | Value |
|---|---|
| Old index at new base date | 100 |
| Old index at overlap | 120 |
| New series at overlap | 100 |
| New series at target date | 110 |
| Result | Value |
|---|---|
| Linked and rebased index | 132 |
Calculation steps
Linked and rebased index = (((100 × Old index at overlap) × New series at target date) ÷ (New series at overlap × Old index at new base date))
(((100 × 120) × 110) ÷ (100 × 100)) = 132
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Old index at new base date | 100 | 110 | Linked and rebased index | 132 | 120 |
| Old index at overlap | 120 | 132 | Linked and rebased index | 132 | 145.2 |
| New series at overlap | 100 | 110 | Linked and rebased index | 132 | 120 |
| New series at target date | 110 | 121 | Linked and rebased index | 132 | 145.2 |
