Calculation guide
Enter total reserved capacity-hours paid for, whether used or idle. Covered hours are the part of actual usage that matched the reservation; excess usage is billed on demand. Allocate the applicable upfront fee to this period.
Inputs
Actual capacity-hours used
Example entry 900.
Reserved capacity-hours purchased
Example entry 720.
Actual hours covered by reservation
Example entry 600.
On-demand hourly rate
Example entry 2 (in the selected currency).
Reserved hourly charge
Example entry 1 (in the selected currency).
Allocated upfront reservation fee
Example entry 80 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| Actual capacity-hours used | 900 |
| Reserved capacity-hours purchased | 720 |
| Actual hours covered by reservation | 600 |
| On-demand hourly rate | 2 |
| Reserved hourly charge | 1 |
| Allocated upfront reservation fee | 80 |
| Result | Value |
|---|---|
| Savings from reservation | 400 |
| Reservation plus overflow cost | 1,400 |
| All on-demand cost | 1,800 |
Calculation steps
Savings from reservation = ((Actual capacity-hours used × On-demand hourly rate) − (((Reserved capacity-hours purchased × Reserved hourly charge) + Allocated upfront reservation fee) + ((Actual capacity-hours used − Actual hours covered by reservation) × On-demand hourly rate)))
((900 × 2) − (((720 × 1) + 80) + ((900 − 600) × 2))) = 400
Reservation plus overflow cost = (((Reserved capacity-hours purchased × Reserved hourly charge) + Allocated upfront reservation fee) + ((Actual capacity-hours used − Actual hours covered by reservation) × On-demand hourly rate))
(((720 × 1) + 80) + ((900 − 600) × 2)) = 1,400
All on-demand cost = (Actual capacity-hours used × On-demand hourly rate)
(900 × 2) = 1,800
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Actual capacity-hours used | 900 | 990 | Reservation plus overflow cost | 1,400 | 1,580 |
| Reserved capacity-hours purchased | 720 | 792 | Savings from reservation | 400 | 328 |
| Actual hours covered by reservation | 600 | 660 | Savings from reservation | 400 | 520 |
| On-demand hourly rate | 2 | 3 | Savings from reservation | 400 | 1,000 |
| Reserved hourly charge | 1 | 2 | Savings from reservation | 400 | -320 |
| Allocated upfront reservation fee | 80 | 88 | Savings from reservation | 400 | 392 |