Cheque float funding cost · Calculation guide

Estimate interest while a deposited cheque is unavailable.

Calculation guide

Use simple interest over actual unavailable days. Enter the day-count basis from the funding quote. No compounding or fees.

cost = amount*rate/100*days/basis · daily = amount*rate/100/basis

Inputs

Cheque amount

Example entry 50000 (in the selected currency).

Unavailable days

Example entry 4. Use whole numbers.

Annual funding rate

Example entry 7.3 %. Allowed range 0 to 100.

Days in interest year

Example entry 365. Use whole numbers.

Worked example

InputValue
Cheque amount50,000
Unavailable days4
Annual funding rate7.3%
Days in interest year365
ResultValue
Funding cost for hold40
Funding cost per day10

Calculation steps

Funding cost for hold = ((((Cheque amount × Annual funding rate) ÷ 100) × Unavailable days) ÷ Days in interest year)

((((50,000 × 7.3) ÷ 100) × 4) ÷ 365) = 40

Funding cost per day = (((Cheque amount × Annual funding rate) ÷ 100) ÷ Days in interest year)

(((50,000 × 7.3) ÷ 100) ÷ 365) = 10

How each input affects this example

Each row starts from the worked example and changes one input.

InputOriginal inputNew inputAffected resultOriginal resultNew result
Cheque amount50,00055,000Funding cost for hold4044
Unavailable days45Funding cost for hold4050
Annual funding rate7.3%8.3%Funding cost for hold4045.479452
Days in interest year365402Funding cost for hold4036.318408
Cheque float funding cost →