Calculation guide
Interest-only bridge for a fixed overlap. Enter the new-purchase cash requirement after its permanent mortgage, and carrying costs excluding bridge interest. No compounding.
Inputs
New-home closing cash needed
Example entry 120000 (in the selected currency).
Cash available at closing
Example entry 40000 (in the selected currency).
Nominal annual interest rate
Example entry 9 %. Allowed range 0 to 100.
Months remaining
Example entry 4. Allowed range 1 to 600. Use whole numbers.
Monthly costs of both homes
Example entry 1800 (in the selected currency).
Contract fee
Example entry 500 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| New-home closing cash needed | 120,000 |
| Cash available at closing | 40,000 |
| Nominal annual interest rate | 9% |
| Months remaining | 4 |
| Monthly costs of both homes | 1,800 |
| Contract fee | 500 |
| Result | Value |
|---|---|
| Required bridge principal | 80,000 |
| Interest | 2,400 |
| Total interim cost | 10,100 |
Calculation steps
Required bridge principal = max(0, (New-home closing cash needed − Cash available at closing))
max(0, (120,000 − 40,000)) = 80,000
Interest = ((((Required bridge principal × Nominal annual interest rate) ÷ 100) × Months remaining) ÷ 12)
((((80,000 × 9) ÷ 100) × 4) ÷ 12) = 2,400
Total interim cost = ((Interest + (Months remaining × Monthly costs of both homes)) + Contract fee)
((2,400 + (4 × 1,800)) + 500) = 10,100
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| New-home closing cash needed | 120,000 | 132,000 | Required bridge principal | 80,000 | 92,000 |
| Cash available at closing | 40,000 | 44,000 | Required bridge principal | 80,000 | 76,000 |
| Nominal annual interest rate | 9% | 10% | Interest | 2,400 | 2,666.666667 |
| Months remaining | 4 | 5 | Interest | 2,400 | 3,000 |
| Monthly costs of both homes | 1,800 | 1,980 | Total interim cost | 10,100 | 10,820 |
| Contract fee | 500 | 550 | Total interim cost | 10,100 | 10,150 |
