Calculation guide
Fund the replacement with equal year-end deposits and no opening reserve.
saving = cost / future value annuity factor · years = ceil(log(retain/100)/log(1−fade/100))
Inputs
Replacement capacity threshold (%)
Example entry 80.0 %. Allowed range 1e-12 to 100.
Annual capacity degradation (%)
Example entry 10.0 %. Allowed range 1e-12 to 100.
Future replacement cost
Example entry 300000.0 (in the selected currency).
Annual reserve yield (%)
Example entry 0.0 %. Allowed range 0 to 100.
Worked example
| Input | Value |
|---|---|
| Replacement capacity threshold (%) | 80% |
| Annual capacity degradation (%) | 10% |
| Future replacement cost | 300,000 |
| Annual reserve yield (%) | 0% |
| Result | Value |
|---|---|
| Required annual reserve deposit | 100,000 |
| Years to replacement threshold | 3 years |
Interpreting the result
Faster capacity fade shortens the funding window and increases the annual deposit needed for the same replacement cost.
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| Replacement capacity threshold (%) | 80% | 88% | Required annual reserve deposit | 100,000 | 150,000 |
| Annual capacity degradation (%) | 10% | 11% | Required annual reserve deposit | 100,000 | 150,000 |
| Future replacement cost | 300,000 | 330,000 | Required annual reserve deposit | 100,000 | 110,000 |
| Annual reserve yield (%) | 0% | 1% | Required annual reserve deposit | 100,000 | 99,006.633444 |
