Calculation guide
Assumes one premium band and one entered tax rate on hammer plus premium. Shipping is entered tax-inclusive and added separately. Round the bid down to a permitted bid increment.
Inputs
All-in budget
Example entry 1340 (in the selected currency).
Buyer premium
Example entry 20 %. Allowed range 0 to 100.
Tax on hammer plus premium
Example entry 10 %. Allowed range 0 to 100.
Shipping including tax
Example entry 20 (in the selected currency).
Bid increment
Example entry 10 (in the selected currency).
Worked example
| Input | Value |
|---|---|
| All-in budget | 1,340 |
| Buyer premium | 20% |
| Tax on hammer plus premium | 10% |
| Shipping including tax | 20 |
| Bid increment | 10 |
| Result | Value |
|---|---|
| Maximum hammer bid | 1,000 |
| Buyer premium amount | 200 |
| All-in cost | 1,340 |
Calculation steps
Maximum hammer bid = (round down((((All-in budget − Shipping including tax) × 10,000) ÷ (((100 + Buyer premium) × (100 + Tax on hammer plus premium)) × Bid increment))) × Bid increment)
(round down((((1,340 − 20) × 10,000) ÷ (((100 + 20) × (100 + 10)) × 10))) × 10) = 1,000
Buyer premium amount = ((Maximum hammer bid × Buyer premium) ÷ 100)
((1,000 × 20) ÷ 100) = 200
All-in cost = (((Maximum hammer bid + Buyer premium amount) × (1 + (Tax on hammer plus premium ÷ 100))) + Shipping including tax)
(((1,000 + 200) × (1 + (10 ÷ 100))) + 20) = 1,340
How each input affects this example
Each row starts from the worked example and changes one input.
| Input | Original input | New input | Affected result | Original result | New result |
|---|---|---|---|---|---|
| All-in budget | 1,340 | 1,474 | Maximum hammer bid | 1,000 | 1,100 |
| Buyer premium | 20% | 22% | Maximum hammer bid | 1,000 | 980 |
| Tax on hammer plus premium | 10% | 11% | Maximum hammer bid | 1,000 | 990 |
| Shipping including tax | 20 | 22 | Maximum hammer bid | 1,000 | 990 |
| Bid increment | 10 | 11 | Maximum hammer bid | 1,000 | 990 |
